View of West Kilby Ditch from double culverts under
Coliseum Boulevard, prior to construction |
11/3/2009 |
 |
View of West Kilby Ditch looking east, prior to
construction |
11/3/2009 |
 |
Section of box culvert prior to installation |
11/3/2009 |
 |
First sections of box culvert installed at east end of
West Kilby Ditch |
11/3/2009 |
 |
Sections of box culvert being installed in West Kilby
Ditch |
11/3/2009 |
 |
Installation of box culvert |
11/19/2009 |
 |
Interior view of connection of 18-inch storm pipe into
box culvert |
12/11/2009 |
 |
Outside view of 18-inch storm pipe into box culvert |
12/11/2009 |
 |
Pouring slab floor for wing walls at discharge from box
culvert into
Main Kilby Ditch |
12/22/2009 |
 |
Sealing off joints in box culvert prior to covering |
12/23/2009 |
 |
Forming for wing walls for discharge from box culverts
into
Main Kilby Ditch |
1/4/2010 |
 |
Forming for wing walls for discharge from box culverts
into
Main Kilby Ditch |
1/4/2010 |